Laserfiche WebLink
<br />-2- <br />Topsoiling <br />I. Phase 1 <br />Case A - no fill added, <br />topsoil to be replaced above shoreline only <br />3600 feet of shoreline <br />20 ft. X 3600 ft. X 1 ft. X 1 yd3/27 ft3 = 2667 yd3 <br />2,667 yd3 X 50.32/yd3 = 5854.00 <br />II. Phase 1 <br />Case B - fill added <br />10 acres to be topsoiled <br />2870 feet of shoreline to be top soiled <br />10 acres X 43,560 ft2/acre X 1 ft. X lyd3/27 ft3 = 16,134 yd3 <br />20 ft. X 2,870 ft. X 1 ft. X 1 yd3/27 ft3 = 2,126 yd3 <br />18,260 yd3 X 50,32/yd3 = 55,843.00 <br />III. Phase 2 <br />2600 feet of shoreline <br />20 ft. X 2,600 ft. X 1 Ft. X 1 yd3/27 ft3 = 1,926 yd3 <br />1,926 yd3 X 50.32/yd3 = 5616.00 <br />IV. Plant Site and Access Road <br />5.4 acres X 43,560 ft2/acre X 1 ft, X 1 yd3/27 ft3 = 8,712 yd3 <br />8,712 yd3 X 50.32/yd3 = 52,788.00 <br />Scarify prior to topsoiling <br />26,136 yd2 X 50.15 = 53,920.00 <br />Seeding <br />I. Phase 1 <br />Case A - no fill added <br />20 feet X 3,600 feet X 1 acre/43,560 ft2 = 1.7 acres <br />1.7 acres X 5300.00/acre = 5510.00 <br />