My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50004
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:46 PM
Creation date
11/20/2007 2:16:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004017
IBM Index Class Name
Permit File
Doc Date
5/6/2004
Doc Name
Final Adequacy Review Comments
From
DMG
To
Environment Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 05/05/2004 <br />User : TAS <br />State :Colorado <br />County :Grand <br />Site : Kattenberg Pit <br />Agency or organization name :Division Of Minerals & Geology <br />Permit or other job action :Final Reclamation <br />task description : Backfill 10,000 cued. overburden into nit <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $43.83 NA <br /> Operating wsUhour : $66.44 100 <br /> Ripper op. cosUhour : $0.00 NA <br /> Operator cosilhour : $31.83 NA <br /> Total unit cost/hour : $142.10 Total fleet cosUhour : x284.20 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 10,000 LCY factor : NA volume: 10,000 LCY <br /> <br />Source of estimated volume :permit <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 1.10 (Cat H8) <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : 1.20 (s-by-s) <br /> Visibility : 1.00 (avg.) <br />Materia( consistency description : Job efficiency : 0.83 (lshifUday) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.07 (Cat HB) <br />Average push gradient : 3.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 1.10 (Cat Ht3) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,100 Ibs/LCY Net correction : 0.77 <br />Weight description <br />Earth -Loam Adjusted unit production : 488.28 LCY/hr <br /> Adjusted fleet production : 976.55 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 10.24 Hours <br />Unit cost : $0.291 /LCY Total job cost : x2,910 <br />Basic machine : Cat D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :NA <br />Permit/job# : M-2004-017 <br />Abbreviation :none <br />Filename : M017--001 <br />Horsepower: 310 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.