My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE49970
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE49970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:45 PM
Creation date
11/20/2007 2:15:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Permit File
Doc Date
4/26/1999
Doc Name
TR 2 TO APPLICATION GROUNDWATER & SURFACE WATER MONITORING PLAN
From
AMERICAN SODA
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 22, 1999 • • Pagc 9 <br />2.4 Local Domestic Wells <br />American Soda will monitor the water quality from local domestic wells. Domestic wells <br />included in the plan aze those located along Piceance Creek, between the mouth of Horse Draw and <br />the north edge of Section 15. Domestic well monitoring will include the Horse Draw well (formerly <br />USBM Ol A) located neaz the abandoned Horse Draw shaft. <br />3.0 GROUNDWATER MONITORING <br />Groundwater levels will be measured in all available monitoring wells. Groundwaterquality <br />samples will be collected for analysis. The sampling frequencies, sampling methods, and <br />groundwater parameters for the baseline monitoring period and during commercial operations aze <br />presented in this section. <br />The groundwater monitoring program is broken into two principal periods, a baseline period <br />and a commercial operations period. The baseline data collection period includes five quarters <br />preceding the startup of commercial operations as specified by the Colorado Department of Natural <br />Resources, Division of Minerals and Geology (DMG). Baseline period requirements aze that eight <br />measurements will betaken in afive-quarter period. During commercial operations, the frequency <br />of monitoring measurements will be reduced as per discussion in Section 33. <br />3.1 Water Lcvcl Monitoring <br />Water levels will be measured monthly for all monitoring well completions except those <br />completed at the Dissolution Surface. Water levels at monitoringwellscompletedattheDissolution <br />Surface will be monitored by automated data recording equipment and evaluated monthly. The <br />monitoring schedule is identical for the baseline data collection period and during commercial <br />miningoperations. Waterlevelmonitoringwillbeconductedinaccordancewithproceduresdetailed <br />in Appendix B. <br />3.2 Groundwater Quality Analytical Parameters <br />Water quality analyses will be conducted for the parameters listed in WQ1, presented in <br />Table 2. Water quality analyses will be conducted less frequently (Section 3.3) for a more <br />comprehensive list of parameters, designated WQ2 (Table 3). These lists of parameters have been <br />Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.