Laserfiche WebLink
File: J:\OOJOBS\003-2166\8-lsubmittal\MB2RF'X 8/1/00, 4:41:32PM <br />• Emergency Spillway Elevation ---- 6119.2 <br />Crest Length (ft) 12.0 <br />Z:1 (Left and Right) -- -- 1.0 1.0 <br />Bottom Width (ft) ---- 8.0 <br />POND RESULTS: <br />Sediment <br />Storage* <br />(ac-ft) <br />1.38 <br />Dead Sediment <br />Space Algorithm <br />(~) <br />----------------------- <br />7.32 20.00 CSTRS <br />*Sediment Capacity based on Average Annual R of 30.0 for 3.0 year(s) <br />Runoff Peak <br />volume Discharge <br />(ac-ft) (cfs) <br />IN 5.04 63.03 <br />OUT 4.37 1.68 <br />Sediment <br />(tons) <br />497.8 <br />40.7 <br />Peak Sediment <br />Concentration <br />(mg/1) <br />133334 <br />7462 <br />Peak Settleable <br />Concentration <br />(ml/1) <br />63.95 <br />0.00 <br />24VW 24AA <br />(ml/1) (ml/1) <br />34.38 9.0"e <br />0.00 O.OC <br />Peak Trap Hydrograph <br />Elevation E£f iciency Detention Time <br />(~) (hrs) <br />• 6114.6===..==91.82======....14 51...== <br />Dewatering Time (Max. Pe rf. Riser Elev to Lowest Orifice): 2.6 days <br />:t**:t+t*t*:t:t**tr*x*s*****:t***:t**x*:t****:t***x*:t********:t*:t**~.t***********:t**+*tr:t+*:t <br /> <br />Page :,2,3 <br />Permanent <br />Pool <br />(ac-ft) <br />