Laserfiche WebLink
Overall the embankment was sound. Vegetation had taken hold <br />on all required areas and no erosion problems were found. <br />The Waterman canal gate for the dewatering pipe was found to <br />be in good condition. Similar to Pond A, it was impossible <br />to verify the construction of seep collars and the <br />embankment keyway, however, no seepage or shifting problems <br />were evident. <br />Except for certain items which could not be verified, such <br />as seep collars, keyway, topsoil and vegetation removal, I <br />certify that Northern Coal Canpany's Ponds A and B at the <br />Rienau #2 Mine have been constructed according to the plans <br />previously mentioned. Prudent state-of-the-art engineering <br />has been employed and the pond is sound, with no current <br />environmental threats or construction problems. <br />~~ ~ LLG~ <br />Date: ~ %o Tr~~ <br />~A~p REGD.. <br />~~D~bPY C. (~'r~.~.y~` <br />. ~O <br />.~ c+ <br />2036 <br />• :4 <br />.p ; <br />. <br />O SSipAIAI EN <br />