Laserfiche WebLink
LIST OF EXHIBITS <br />• Exhibit No. <br /> 13-1 Facilities Map <br /> 13-2 Surface Hydrology Map -Mine Area <br /> 13-2A Surface Hydrology Map - II-W South <br /> 13-3 Surface Water Control Plan -Tie-Across Haul Road <br /> 13-4 Watershed Boundary Partial <br /> 13-5 Proposed Sedimentation Pond 005 <br /> 13-5A Pond 005 As-Built <br /> 13-6 Pond 006 Phase II As-Built <br /> 13-6A Pond 006 Phase IV Subwatershed Map <br /> 13-6B Pond 006 Phase IV Design <br /> 13-6C Pond 006 Phase IV Pre-Settling Basin Design <br /> 13-6D Pond 006 Phase V Subwatershed Map <br /> 13-6E Pond 006 Phase As-Built <br /> 13-7 Proposed Sedimentation Pond 009 <br /> 73-7A Sedimentation Pond 009 As-Built <br /> 13-8 Proposed Sedimentation Pond 015 12 sheets) <br /> 13-8A Proposed Sedimentation Pond 076 12 sheets) <br /> 13-86 Proposed Sedimentation Pond 017 12 sheets) <br /> 13-8PP Topsoil Stockpile PP Sumps PP-St and PP-S2 IAs-Built) <br />• 13-SQQ Topsoil Stockpile QQ Sump C!Q-S1 IAs-Built) <br /> 13-8RR Topsoil Stockpile RR Sump RR-Si IAs-Built) <br /> 13-9 Pond 15 As-Built <br /> 13-9A Pond 16 As-Built <br /> 13-96 Pond 016 Design Revision <br /> 13-9C Pond 016A As-Built <br /> 13-9D Reserved <br /> 13-9E Pond 017 As-Built <br /> 13-10 Typical Road Details <br /> 13-11.7-11.8 Tie-Across Haul Road (AS-Built) <br /> 13-12.7-12.4 Mine Entrance Haul Road IAs-Built) <br /> 13-13.1-13.5 Haul Road A (As-Built) <br /> 13-14.1-14.3 Haul Road B <br /> 13-15.1-75.2 Haul Road C <br /> 13-16.1-16.2 Reserved <br /> 13-17.1 Reserved <br /> 13-18.1A Haul Road FIAs-Builtl <br /> 13-19.1A-19.4A Haul Road GIAs-Builtl <br /> 13-20.1A Haul Road HIAs-Built) <br /> 13-21.1 Plan and Profile, Haul Road I <br /> 13-21.1A Haul Road IIAs-Builtl <br />• 13-22.1A Haul Road JIAs-Builtl <br /> 13-23.1 Plan and Profile, Haul Road K <br /> TR-48 iii <br />Revised 06/04 <br />