Laserfiche WebLink
~ III IIIIIIIIIIIII III <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver. CO 60203 <br />303 866-3567 <br />FAX: 303 832-8706 <br />April Z1, 1992 <br />Mr. George Gregg, General Manager <br />Valco-Gunnison Concrete Division <br />P.O. Box 837 <br />Gunnison, CO 81230 <br />Or ~' <br />.~~' <br />/fl ]y <br />Aay isomer. <br />Gavemor <br />Micnae~ B. Long. <br />Division Duenor <br />Re: Vader, Rozman, and Gunnison Ready Mix Pits (Permits M-78-287, M-81-014, <br />M-77-023) Operators' Response to Sign and Boundary Marker Concerns <br />Expressed in Division Inspection Reports of 3/12/92 <br />Dear Mr. Gregg: <br />The above-referenced response has been received by the Division. Thank you <br />for your prompt attention to the matter. <br />In regard to Problem 3 in the Gunnison Pit Inspection Report, I apparently was <br />premature in mentioning product stockpiles. The Division is attempting to <br />secure a policy decision from the Mined land Reclamation Board in regard to <br />bonding for these. Until that decision is made, you may eliminate product <br />stockpiles from the requested amendment together with any estimated cost of <br />reclamation or attendant banding. Modifying the reclamation plan in your <br />permit and increasing the bond, if necessary, to provide for reclamation of <br />the buildings and facilities in the office area, however, should still be done. <br />If you have any questions on the above, please contact me. <br />Sincerely, <br />James C. Stevens <br />Senior Reclamation Spec'alist <br />JCS/bjw <br />s-~~T~bF coLO~,~o <br />'-568F <br />