Laserfiche WebLink
FEB-25-2003 'fUE p3~10 PN <br />' r: <br />TI~IOblA9 T.; I+ARL£Y <br />WILLIAM p. MAT'POON~ <br />1'ATRJCIC i"iARCIh. <br />JAMLS R.~f3ERT.RR <br />VALSRJG V~~$AYN~ <br />VIA FACSIMILE <br /> <br />719 542 8515 <br />T'ETERSEN~ & FONDA, P.G. <br />ATTOIt1VEYS AT LA W <br />215 WBST ~'(iCOND STRG&T <br />PUEHLLI, Cn 81003.3251 <br />'falophono(719)345-933D <br />Ftwyimile (719) 542-8515 <br />o-mull: infoQpotorson-Pondacom <br />February 25, 2003 <br />P. 02 <br />GARRH'19' pONDA (1915.1981) <br />HARRY $. Pf"I'hRSEN (19U1.199U) <br />?~ <br /> <br />;.~ <br />~;: <br />X99 <br />--:,: ~.. <br />4 <br />~ETERSEN & FONDA, PC <br />V t.: ! <br />Colgrad~ Division of <br />ATTENTION': Mr. 'P'ony <br />1313 Sherman Streeir, <br />Denver, ;CO 8020,3 <br />Mining and Geology <br />Waldron <br />Room 215 <br />Re: Construction Materials Reclamation Permit Application <br />;Boyer Pit, Flle No.: M-2002-12'2 <br />Dear Mr:. Waldron: <br />This :;letter will advise you that our office represents the <br />interesi~s'+of elf Springs Ranches, Inc., which is a buffalo and <br />Arabian horse ranghing operation lying adjacent to the proposed <br />mining. Site y plient's ranch lies on approximately 50,000 <br />acres wl3ieh in luFie natural grass and timber.. The water supply <br />oonsist~, of natural springs and creeks, ground water from wells, <br />and supplem nYed roy irrigation canals. The land also contains <br />several',res dences. <br />It.ia ur understanding that a pre-conference hearing wil <br />'c cur on qr about March 27, 2003. This letter will request th~t <br />y office b apprised of when that date and time have been fir ly <br />et and the the p~'e-conference hearing be conducted in <br />estcli~fe, Colorado. It is our understanding that numerous <br />esidents;o Custer County and other land owners have a desire. to <br />artidipa{e in the~pre-conference hearing and thereby express <br />heir objec ion tojthe application. This letter constitutes <br />~i otice;bf formal o??jection of my client to the above mentioned <br />appllca'i=1'dn. My cl,lent also wishes to participate in the pre- <br />conference hearing and to present testimony when the application <br />is cons3.dered by the Mined Land Reclamation Board. <br />!, <br />In'''tkie Divisign's January 2, 2003 letter to Joe Gagliano of <br />LJ Development, In ., you require that the Division be provided <br />with the source of~legal right of the applicant tq enter and <br />initiate a mining operation on the affected .l and. I would like <br />