Laserfiche WebLink
CAM Mining LLC <br />Water Sampling Report <br />Date: 12/23/06 <br />Weather Conditions: Overcast, Calm, 31 degrees F. <br /> Surface Water <br />Sample <br />Point Time Flow <br />cfs pH EC <br />umhos/cm Temp (C) <br />SW-1 2:43 PM 0.3 8.1 3600 1.6 <br />SW-2 3:00 PM Dry - - - <br />SW-3 3:11 PM Dry - - - <br />SW-4 3:30 PM Dry - - - <br />SW-5 3:00 PM Dry - - - <br />SW-6 3:15 PM Dry __ _ -_ - - <br />SW-7 3:15 PM Dry - - - <br />SW-8 2:00 PM 0.30 7.9 3900 1.1 <br /> <br /> Ground Water <br />p <br />SPoint <br />Time <br />feet <br />pH <br />umhos/cm <br />Tem C <br />P( ) <br />GW-1 2:29 PM 11.3 7.5 6100 10.0 <br />GW-3 2:11 PM 37.2 7.4 4600 11.4 <br />GW-6 3:12 PM Dry-18.8' - - - <br />Location of Points/Wells <br />SW-1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek -2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north spld <br />SW-7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />Fourth Quarter 2006 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />G W-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br /> Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br /> during gob pile construction. <br />