Laserfiche WebLink
• <br />~ ~ - ` -' <br />C~/aL c' <br />~:~~ COMPANY <br />May 2, 1983 <br />Mr. Dan Mathews, Reclamation Specialist <br />Mined Land Reclamation Division <br />423 Centenrial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Dear Mr. Mathews: <br />S'3t State Highv,ay 13 <br />P.tee~~~. Celoradu at6at <br />1~03t92a-aa51 <br />The following information and plans are submitted to comply with <br />• <br />Stipulation No. 1 included in Cglowyo's Mining Permit No. C-019-81. <br />Enclosed is a surface water monitoring and well monitoring locati^n map, <br />Water Monitoring Sites For Permit No. C-019-81 (Map 37). <br />As stated during the application process, Colowyo will suhmit to <br />the ?i. L.R.O. an annual report containing all of the data obtainei from <br />these and all other required monitoring and sampling programs. The first <br />annual report will be for the period January 1, 1983 tttrouch December 31, <br />1983 and will be submitted by April 1, 1984. <br />Water Monitoring Plan <br />The following plan is submitted to satisfy.Stipulatio~t tip. 1 and <br />also includes the complete Surface Water Monitoring Play. <br /> <br />1. Sediment Ponds - There are currently three existing sed~;»ent <br />ponds, with valid N.P.D. E. S. Permits, controlling runoff from <br />disturbed areas at the mine and loadout site. A fourth pond <br />planned to be constructed and is shown as Pt. 004 on Water <br />Monitoring Sites For Permit No. C-019-81 (Mar, 37). A cc?y of <br />Colowyo's N.P.D.E.S. Permit No. CO-0032832 is enclosed. <br />Following is a list of N.P.O.E.S. sampling requirements during <br />periods of discharge. <br />Weekly Sampling For: <br />a. Flow <br />b. PH (Field) <br />c. Conductivity (Field) <br />d. Temperature <br />e. Oil and Grease (visual) <br />Monthly Sampling For: <br />a. Flow <br />b. PH (Lab & Field) <br />4.05-11 <br />