Laserfiche WebLink
BUART~Y POND INSPECTION REPORT <br />.~ III IIIIIIIIIIIIIIII <br />l 1 ~ PAGE 1 OF 3 <br /> 9s9 <br />ERATOR: SNOWMASS COAL CO_ OUARTER: ITHIRD QUARTER 1989 ~ <br />NE: N0. 1 & N0. 3 MINES DATE OF INSPECTION: SEPTEMBER 29. <br />i 1989 <br />ND IDENTIFICATION P-1 P-2 I P-3 P-4 P-5 <br />~E OF POND DETENTION RECLAIMED SEDIMENT DETENTIONIDETENTION <br />aTUS DURING INSPECTION : I <br />PROXIMATE WATER LEVEL DRY 12" DRY DRY I <br />~ (% total storage) OK OK OK OK <br />TFLOW (cfs) NONE NONE NONE I NONE <br />aTURES PROBLEM COMMENTS <br />JSIONAL: YEu NO <br /> I <br />gills & Gullet's X <br />adequate Vegetation X <br />~tlet Channel Erosion X <br />grows X <br />:her X <br />?UCTURAL: <br />fferential Settling X I <br />-acks or Slides I X <br />i <br />:e page I X <br />:her I X <br />=URTENHNT STRUCTURES: I <br />:fective Spillways I I X I <br />=water Device Clogged I X <br />ulty Gates, Etc. X <br />her <br />I I X <br />! <br />~ <br />ITIONAL COMMENTS: <br />NTENHNCE REQUIRED: NONE <br />Lg9 <br />E OF INSPECTDR: JIM STOVER 'p'2~ <br />