Laserfiche WebLink
.w r: - <br />,~ - <br />is :a-a 'n3 .:-: ~ .. _ ._. <br />-e.~ _ - <br />' OCT 2 2 1985 <br />PIONEER t,. ~ A ;.. ~.~.., .,;;,-.:.-., <br />ENGINEEI~'pi'~6°' ;;,jam-~~ ~~S14:GLJ <br />~ CORPORATION <br />w <br />SEDIMENT POND CERTIFICATION <br />I, Darry A. Ferguson, as an agent for Pioneer Engineering Corporation <br />for, through and under the Corporation, but not otherwise, do hereby <br />certify that Sediment Pond No. 1 for Pueblo Coal Int.'s Carbon Junction <br />Mine has been constructed in accordance with applicable design specifi- <br />cations presented in the approved mining permit and is appropriately <br />represented by the attached drawing 1103-100 dated September 17, 1984. <br />The undersigned has made a final site inspection of the subject pond on <br />.tune 26, 1985 for said certification. - <br />The certification is [o effect on behalf of Pueblo Coal, Inc. <br />compliance with Rule 4.05.6(7) of the Rules and Regulations of Coloradc <br />Surface Coal Mining Reclamation Act. <br />The certification does not warrant or otherwise represent that the <br />design of sizing, staging, location or construction, as approved by the <br />411ned Land Reclamation Division, cannot result Sn non-complying discharges <br />for precipitation events in excess of the 10 year - 24 hour event. Further <br />operational aspects of [he structure and sediment control systems must be <br />maintained as per the approved oermit to effect implementation of the <br />system. <br />Certified and signed this 27th day of June, 1985. <br />`~~v--~ 1~ -- <br />~/2~ 2'7, ~~S" S <br />I <br />I, <br />Pioneer Engineering Corporation <br />By: ;'Ull, -4 C c <br />Dares A: Ferguson ; <br />Colorado Registered PE II~C~ <br />(}. 1~ ~ I <br />ENGINEERING - GEOLOGY - EXPLORATION - DEVELOPMENT _ <br />