Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Identification <br />of Pond <br />s During Inspection: <br />>ximate Water Level <br />nent (% total storage) <br />~w (cfs) <br />nional <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />Bowie Resources LLC <br />Bowie No. 2 Mine - C-96-083 <br />Quarter: Fourth 2006 <br />Inspection Date: 20-Dec-06 <br />B C D -Gob Pile F -New Gob J UTL East K UTL West <br />Sediment Sediment Sediment Sediment Sediment Sediment <br />7' 5' Pool 1' Snow Covered Snow Covered <br />20% 0% 0% 0% 0% 10% <br />0 0 0 0 0 0 <br /> <br />Problem Problem Problem Problem Problem Problem <br />Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No <br /> <br />No No No No No No <br />No No No No No No <br />No No No No No No <br />No No No No No No <br />No No No No No No <br />Differential Settling No No No No No No <br />Cracks or Slides No No No No No No <br />Seepage No No No No No No <br />Other No No No No No No <br />purtenant Structures <br />Defective Spillways No No No No No No <br />Dewatering Devices Clogged No No No No No No <br />Faulty Gates, Etc. No No No No No No <br />Other No No No No No No <br />ditional Comments Sediment ponds were covered with snow and ice. <br /> Design depth measured from pond bottom to invert of emergency spillway: <br /> Pond B=10, C=10, D=7.7, J=6, Kam, F=10' TD coma®®• <br /> Pond Bottom Elevations 8=5942, C=5990, D=5972, F=5944, J=5852, K=58 ° O R EG/ • <br />S~P~ <br />Sl° <br /> ,....... <br />o <br />~~p~ •S E. S~•••F.p~a <br />Water level in pond D was below the level of the primary spillway pipe. <br /> • <br />Mud Pits were not accessible. ®O ~ ~' ~G'. O`E <br />~ <br />~ <br />intenance Required: ~ R <br />The sediment from Ponds C & D had been removed during the quarter ~ <br />c~- A: ~ ~ <br />0 <br />2 <br />~ 19 <br /> ~ ~, <br />*; <br />1 <br />` <br />L f~t7~~~ <br />a <br />ne of Inspector: Jim Stover 0'° <br />e ~ <br />~~p •• •>° ~F <br /> J. E. ~c~••••o•.NV 6 <br />