Ms. Erica Crosby <br />Division of Minerals and Geology <br />April 5, 2006 <br />Page 6 of 21 <br />16. In accordance with Rule 6.4.5(2J(d), please state the proposed timing of seeding and <br />planting. <br />Seeding for final reclamation of disturbed areas, as welt as seeding of berms for <br />temporary stabilization, will occur from November through April, as ground <br />conditions allow (i.e. unfrozen soil), per recommendations from NRCS (please refer <br />to Attachment A in the original application). <br />Rule 6.4.7 Exhibit G-Water Information <br />17. Please provide as estimate of the project water requirements including flow rates <br />and annual volumes from the development, mining and reclamation of the project as <br />required by Rule 6.4.7(3). In addition, please submit a copy of the source of the <br />water rights obtained by Asphalt Paving to supply the project water requirements for <br />the mining operation and reclamation. <br />Projected water requirements for the project are approximately as follows, assuming <br />240 working days per year. The Brighton Ditch share (certificate of which is included <br />as Attachment 4) will be used as a source of augmentation water for the project. <br />Demand Item Dail Re uirement Annual Re uirement Source <br />Potable/sanitary 10 employees x 15 36,000 gallons = 0.1 Exempt or <br />water gpd/employee = 150 acre-feet augmented <br /> gallons/day; commercial well <br /> (to be permitted) <br />Dust control and 10,000 gallons; 2,400,000 gallons = 7.4 Augmented <br />landscape irrigation acre-feet commercial well <br />Aggregate washing 17,000 gallons (assuming 3,726,000 gallons = Augmented <br />of 300,000 tons/yr 90% recycle rate) 11.4 acre-feet commercial well <br />Augmentation N/A Approx. 10 acre-feet for Brighton Ditch <br />water first 5 years, or until share <br /> Phase 1 is backfilled <br /> and Phases 2 & 3 have <br /> been lined and <br /> dewatered <br />Concrete batch 17,500 gallons/day 30,000 cu. yds per year Augmented <br />water and washout x 35 gallons/cu.yd. = commercial well <br />water 1,050,000 gallons = 3.2 <br /> acre-feet <br />TOTAL 32.1 acre-feet/ r <br />Expected flow rate from an augmented well is approximately 100 gallons per minute. <br />Asphalt Paving Company will obtain from the State Engineer both a Gravel Well <br />Permit for exposure of groundwater in a pit, and a well permit for process water <br />needs, prior to use or exposure of groundwater at the site. <br />