Laserfiche WebLink
Table 22 <br />• Hydrology Monitoring Requirements <br />Golden Eagle Mine <br /> <br /> Water Field Short Annual <br />Site Level Measurement` List' List' <br /> <br />Groundwater Sites: <br />PAW-5 Q Q S A <br />PAW-6 Q Q S A <br />CCAW-1 Q Q S A <br />LA-264 (overburden) S <br />SF-2 (Overburden) S <br />NM-22 (Overburden) S <br />NM-20 (Overburden) S <br />NM-21 (Coal) S <br />GEM-1 (Mine Workings) M S S A <br />GEM-2 (Mine Workings) M S S A <br />• GEM-3 (Mine Workings) M S S A <br />KEY; M =Monthly <br />Q =Quarterly (February, May, August, & November) <br />S =Semi-Annually (May 8 November) <br />A =Annually (November) <br />= See Table 23 for parameters Included in each suite <br />i. <br />GE: TR-52 <br />2.05-47c <br />(Revised 4/2/01) <br />