My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21234
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:49 PM
Creation date
11/20/2007 2:06:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Hydrology
Doc Date
4/30/1985
Doc Name
CERTIFICATION REPORTS FOR TRINIDAD BASIN MINE
From
PANORAMA RESOURCE SERVICES INC
To
MLRD
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ TRINIDAD RAS1N MINING, 1NL'. <br />I SEDIMENT FOND CERTIFICA710N REPORT <br />8. Sediment Fond: 22-F'4 <br />A) Comments: <br />This pond was e>;panded during the April, 1985 work period <br />so that all other ponds in the F'it 1 drainage could be <br />eliminated. From detailed inspection of the site, it was <br />found that the southernmost reclaimed pit area had <br />revegetated well and that it was unnecesssary to direct <br />this water into the sediment pond. A minor revision <br />request is submitted separately which describes the change <br />in detail. Fond 22-F4 was nevertheless constructed as <br />designed. <br />R) Design Basis for Certification: <br />Revision to Surface Hydrology Designs submitted by Panorama <br />Resource Services, Inc. on Uctaber c^9, 1984. <br />C) Constructed Elevations: <br />The elevations listed below were checked with a precision <br />level and stadia rod: <br />Dewatering Pipe Inlet <br />Dewatering Pipe Uutlet <br />Top of Dam <br />Rottom of Spillway <br />Toe of Dam <br />Rottom of Fond <br />The dam location was much wider than that shown in the <br />design. phis allowed the dam height to be lessened while <br />maintaining adequate pond volume. Constructed elevations <br />are not shown in the design but are adequate for pond <br />performance. <br />D) Rottom Width of Spillway <br />Design: 5.0 feet <br />Measured: 5.' feet. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.