My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21234
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:49 PM
Creation date
11/20/2007 2:06:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Hydrology
Doc Date
4/30/1985
Doc Name
CERTIFICATION REPORTS FOR TRINIDAD BASIN MINE
From
PANORAMA RESOURCE SERVICES INC
To
MLRD
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`. <br />;~. h'HNUkHMA RESDUkCE ;iERV1CE5, IIVC. <br />Geologists, Engineers ~ F'ermitters <br />1675 Lar~mer Strecat, Suite 7:,~> <br />Denver, Colorado 6u2u2 <br />3U~-629-7;,9G <br />iiiiiiiiiiiiiiiiii <br />Hpril ~(l, 1985 <br />Plr. ivchael S. Savage <br />keclamation Specialist <br />Mined Land keclamation <br />Colorado Department of <br />1~i~ Sherman St., koom <br />Denver, Colorado 802U <br />Division fi~~ 01~d5 <br />Natural Resources 6!INEDlA1VDRECUAIATIDN~ON <br />4"' Colo. Dept of lJ~tur~l Resourees <br />ke: Certification keports for the Trinidad Basin Mine <br />Dear Mile: <br />Enclosed are the hydrologic certification reports for the <br />Trinidad Basin Mine. Worl; began on Hpril ~~, 1985 to revise the <br />sediment control system at the mine and also to perform final <br />reclamation. By April 2(7, 19ES, all sediment ponds to remain <br />were brought to specifications. Other sediment ponds were <br />reclaimed, three unreclaimed pits were bac4:filled and topsdiled, <br />the coal pad area was reclaimed, rills and gullies were repaired <br />and certain haul roads were reclaimed according to permit <br />requirements. <br />Hlthough good weather was a factor in the timely completion of <br />the wort:, the but{: of the credit gdes to the crew. The four <br />man-one woman crew (three from F;entucky> was undoubtedly the most <br />efficient crew I have ever been associated with and the fob was a <br />prime example of what can be done in a short period of time if <br />the right people are working together. Mike, your assistance in <br />wvrl:ing with us throughout the reclamation process is greatly <br />appreciated. <br />Site inspections and measurements needed for the certifications <br />were per#armed throughtout the period from April 3 to April 2u, <br />1985. 1 am a certified engineer in the State of Colorado with <br />experience in the Eastern and Western U. S. in the design and <br />construction of haul roads, sediment ponds, coal refuse sites and <br />other facilities normally associated with coal mines. <br />Inspections and measurements were conducted by myself and <br />Trinidad Basin Mining employee Mary Bartlett. A precision eye <br />level, stadia rod and measuring tape were used to verify <br />elevations, slopes, pond volumes, etc. <br />., . <br /> <br /> .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.