Laserfiche WebLink
<br />' for Cattails and Reeds. It is expected that Cattails and Reeds <br />t will invade shallows as well as water areas immediately offshore, <br />thereby providing excellent wildlife habitat and littoral conditions. <br />' 9. Grazing. No grazing will be permitted during the first <br />two or three years of ter revegetation because of the harm that <br />' it would do to young plants. <br />' Reclamation Timetable. The reclamation phases listed below <br />may be correlated to Map Exhibit F. The phases correspond to <br />' the mining stages and are numbered accordingly. Note that these <br />are estimates only and variations may occur. <br />' RECLAMATION TIMETABLE <br /> Estima ted Acr es +/ - <br />1 * <br /> Undis- Bank Revege- <br /> Phase Years Total turbed Water Slone Road tation Creek <br />' 1 2-5 107.28 6.52 65.17 10.25 0 28.67 6.92 <br /> 2 2-5 48.17 2.89 23.34 3.86 0 18.53 3.41 <br /> 3 2-5 61.36 9.80 38.23 6.33 .25 13.08 0 <br /> Totals 216.81 19.21 126.74 20.44 .25 60.28 10.33 <br />1 *Also included in Water or Revegetation acreage estimates <br />II <br />I1 <br />1 <br />I' <br />' 20 <br />