My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_PERMIT FILE - M1984099
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1984099
>
_PERMIT FILE - M1984099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 1:53:50 PM
Creation date
11/20/2007 2:06:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984099
IBM Index Class Name
Permit File
Doc Name
REGULAR 112 PERMIT APPLICATION
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />' The operator plans to complete final grading, fertiliziing <br />' and seeding within one year of the completion of each mining <br />stage. When possible, planting and fertilizing will occur in <br />' each planting year between the middle of March and the first <br />week in April. If spring planting is impossible and fall planting <br />' is unavoidable, the operator will plant between mid-September <br />' and late October. During the balance of the reclamation phase, <br />reclamation progress will be monitored and remedial work will <br />' be performed where necessary. <br />Reclamation Performance Standards. The operator intends <br />' to operate the site in compliance with the Reclamation <br />' Performance Standards of Rule 6. <br />Grading will be performed to create a final topography <br />' appropriate to the planned future land use. When backfilling <br />is necessary, the operator will place fines and waste rock <br />' materials in the mined area and will insure that heavy equipment <br />used for this purpose is compacting the earth sufficiently well <br />to achieve good stability. All grading will be done in a manner <br />' to control erosion and to protect areas outside the affected <br />land from slides or other damage. Backfillin9 and grading will <br />' be completed as soon as feasible after the mining process. Refuse <br />will be handled and disposed of in a manner that will control <br />' unsightliness and protect the drainage system from pollution. <br />' There are no acid-forming or toxic materials involved in <br />this operation. There will be no drill or auger holes left on <br />' the land. Maximum slopes will be within the limits set forth <br />' 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.