Laserfiche WebLink
Section - 2.05.3 <br />percent and 30 percent, respectively, both to control drainage and to catch and retain <br />• loose rock from above. <br />G. Sedimentation Pond ERoad -Alight use road extends from the II West Haul Road to <br />Sedimentation Pond E to provide access for pond inspection, maintenance, and <br />monitoring. This road is approximately 1,500 feet long. <br />Road construction methods are similar for all classes of roads. Construction generally involves initial <br />clearing of vegetation, recovery or windrowing of available soil materials (where operationally <br />feasible), cut-fill excavation and placement or sidecast construction (light-use roads only), <br />• <br />f. J <br />TR-43 2.05-31a Revised August 2003 <br />