Laserfiche WebLink
k There will not be refuse and acid or toxic materials generated or handled in this <br />mining operation. <br />I Reclamation activities will be stated as soon as the mining operations are <br />completed in the summer of 2007. Reclamation activates and storm water <br />management practices will prevent off site damage and stabilize the site for future land <br />use. <br />m No on site processing of the mined materials will be done. <br />n. The materials mined from the site will be pit run and AASHTO A-2-4 <br />embankment material with a 12 to 16 inch top size. <br />o. The general fill materials will be used to construct the bridge and roadway <br />embankments needed for the phase three Riverside Parkway and US-50 Highway <br />interchange which is located approximately''/z mile north of this site. This interchange is <br />apart of the City of Grand Junction's $110 million Riverside Parkway roadway project. <br />All CDOT approvals for this interchange have been acquired. <br />2529 HIGH COUNTRY COUR'l,GRANDJUNCTION,C081501 P[970]2564I77 F[970]2564014 riversideokwvCa~aicitv.ore <br />