My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21202
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:49 PM
Creation date
11/20/2007 2:05:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Hydrology
Doc Date
1/3/2000
Doc Name
COLOWYO COAL CO LP ANNUAL STORMWATER REPORT FACILITY ID CO-0045161
From
KENNECOTT ENERGY COLOWYO COAL CO LP
To
WQCD
Permit Index Doc Type
OTHER GROUND WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S1'ORI~ZWATER ANNUAL REPORT - COAL, <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control Division <br />WQCD-PE-B2 <br />4300 Cherry Creek Drive Sauth <br />Denver, Colorado 80222-1530 <br />Please print or type. Fill in each section. <br />Permittee (Company Name): Cn 1 nwn C na 1 (nm any T. _ P <br />Facility Natne: cnlnwvn Mine <br />Facility Address: 6731 State HiQhwav 17 <br />Mee1CPr rn A1FiLl <br />Facility Phone Number. ~,g~o ~ 824-1531 <br />Permit Certification No: ~-0Fr83E1-_--_ _ co-oo4516i <br />Reporting Period: Jan. 1-Dec. 31, 19 ~. ~ <br />RECE~~ED <br />JAN p 3 2000 <br />Division of Minerals 8 Geology <br />A. d report on the facUiry's overall compliance with the SWMP. (Include here a summary of arty measures <br />taken to comply with your Stotmwater Management Plan (SWMP), to fully implement it, changes or <br />improvements made in arty of your Best Management Practices (BMPs), problems encountered, spills, <br />other potential violations, etc.) <br />Inspections of all areas show compliance with the SWt~. The site received very little <br />moisture during the months of April through December, as compared to previous years. <br />Were changes made to your SWMP? ©Ne .. ~ Yes - Desrn'be changes on a separate sheet. <br />NOTE: The SWMP is currently being revised to reflect the new In Nstrial D's barge P rmit. <br />B. A stomnary of each comprehensive stormwater facility inspection made, ntc g dQalle, ~rngs, and <br />action ta.Een. (The permit requires at least two comprehensive facility itspections per year -see page 10 <br />of the permit Include here a summary of those inspections, plus any other comprehensive inspections <br />made. It is not necessary to sununarize day-today inspections, unless significant problems were noted.) <br />First Inspection -Date ~,/~,Q/~. Findings, and action taken: Inspections made throughout the m..~th <br />^f Ma~ Partial inc~r'o~~~Rprformed ac Harr of rh rhly n' ; i f <br />Minerals and Geology field insoectionG D fic; n ; c are .r r ~ ~ <br />corrected as part of meeting compliance with the Department of Minerals and <br />Geology mine .permit. <br />•Pinte -form may be [eprodueed page 1 of 2 att/9kl <br />
The URL can be used to link to this page
Your browser does not support the video tag.