My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE49542
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE49542
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:51:27 PM
Creation date
11/20/2007 2:05:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
MR-13 Continued
Section_Exhibit Name
EXHIBIT 15 Part 2a
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• REQUIREMENTS OF RULES 4.03.2(3)(c)(iI OR (dI(viil); OR IN THE ALTERNATIVE. THE <br />OPERATOR SHALL SUBMIT A PROPOSED RECLAIMED CONFIGURATION NITH APPROPRIATE <br />STABILITY ANALYSES TO DEMONSTRATE CONFORMANCE WITH THE REQUIREMENTS OF RULE <br />4.03.2(7). <br />Status - In compliance, Future Submittals <br />STIPULATION N0. 10 <br />THE DIVISION DIRECTS DORCHESTER COAL COMPANY TO MONITOR THE LOCATION AND <br />ORIENTATION OF THE THOMPSON RANCH STRUCTURES. THE APPLICANT SHALL SURVEY <br />THESE STRUCTURES ON A QUARTERLY BASIS. <br />Status - Not 1n Compliance <br />The Division has not received reports for subsidence monitoring of the <br />Thompson Ranch structures for 1986. The Southfield Mine should submit the <br />quarterly monitoring results for the Division's reviex. <br />STIPULATION N0. 11 <br />THE DIVISION DIRECTS DORCHESTER COAL COMPANY TO SUBMIT A PROPOSED REPORT <br />FORMAT FOR 7HE REQUIRED SEMI-ANNUAL SUBSIDENCE MONITORING REPORT, NITHIH 190 <br />• DAYS FOLLONING PERMIT APPROVAL. THIS REPORT FORMAT SHALL INCLUDE TABULATED <br />SURVEY MONUMENT AND STRUCTURE LOCATION AND ORIENTATION DATA. SURVEY DATA FOR <br />THE TMO HIGH-RESOLUTION MONUMENT GRIDS SHALL AL50 BE PRESENTED GRAPHICALLY, IN <br />CROSS-SECTION FORM. THE SUBSIDENCE MONITORING ORDER TO FACILITATE DATA <br />REPORTING AND ANALYSIS. FINALLY, SEMI-ANNUAL SUBSIDENCE MONITORING REPORT <br />SHALL INCLUDE A SUMMARY COMPARISON OF MONITORING RESULTS AND THE APPLICANT'S <br />PREDICTIONS FOR EACH INVENTORIED STRUCTURE AND THE STREAM CHANNEL OF NENLIN <br />CREEK. <br />Status - Not in Compliance <br />The Division could not find the proposed format for the semi-annual subsidence <br />monitoring report. Please submit his report for the Dl vision's review. <br />Summary of Stipulation Review <br />Of the eleven stipulations to the permit Nos. 2, 3. 6, 7 and 11 were not <br />complied with. These stipulations deal with hydrology and subsidence issues. <br />The non-compliance to the stipulations are covered in more detail in the <br />enclosed enforcement memo. Asa result of non-compliance. enforcement actions <br />will be taken and compliance deadlines for the stipulations will be set in the <br />Notice of Violation. <br />• <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.