Laserfiche WebLink
Paperwork ]Reduction Act Notice <br />I Public repor.ing burden for [his collection of information is estimated [o vary from a range of l0 hours as an <br />average per response for some minor facilities, to 110 hours as an average per response for some major facilities, <br />with a weighted average for major and minor facilities of 18 hours per response, including time for reviewing <br />instructions, searching existing data sources, ga'.hering and maintaining the data needed, and completing and <br />reviewing the collection of infot>na[iom. Send comments regarding [he burden estimate or any other aspect of <br />this collection of information, including suggestions for reducing this burdem, [o Chief, information Policy <br />Branch, PM-223, U.S. Environmental Protection Agency, 401 M Street, SW Washington, DC 20460; and to fire <br />Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, DC 20503. <br />General Instructions <br />1. If form has been partially completed by preprinting, disregard instructions directed at entry of That information <br />already preprinted. <br />2. Enter "Permiltee .Name%blailing Address (and facility nartte/location, if different)," "Permi( A'umber," and <br />"Discharge Number" where indicated. (A separate form is required Cor each tfischazge.) <br />3. Enter dates beginning and ending ",tfonrtoring Period" covered by forth where indicated. <br />4. Enter each "Pararnerer" as specified in monitoring requirements of permit. <br />5. Enter "Sarnple,tfea.vurement" data for each pa'ameter under "Quantity" and "Qva/ihl' in units specified in Fermi[ <br />"Average" is normally arithmetic average (geometric average for bacterial parameters) of all sample measurements <br />for each parameter obtained during ".ifonilorir,g Period'; ".tlraimum" acd ",Nimmum" arc nornutlly extreme high <br />and low measurements obtained during ".I tonirormg Period" (Note ro municipals Hith secondary Vcatment <br />requiremenC Enter 30~ay avcmgc of sample measurements under "Average," and enter maximum 7-day average <br />of sample measurements obtained during monitoring period under ".~Jaxin,um. <br />6. Enter "Permit Reyavrment" (or each parameter under "Quantity" and "Quality" as specified in permit. <br />7. Under ".'v'n Es" toter number of sample mcasurrncnts during monitoring perod Lhat exceed maximum (and/or <br />minimym or 7-day average as appropriate) permit requirement for each parameter If none, enter "0". <br />8. Enter "Frequency ojAnalysis" both as "Smnple .tleawrment" (actual frequenn• of sampling and analysis usec <br />during monitoring period) and as "Permi! Reyuirenrent" specified m permit. (e g., Enter "Copt," for continuous <br />monitoring, "I/T' far one day per week, "l '30" for one day per monllL "/i90" for one day per quarter, etc.) <br />9. Enter "Smnple Type" both as "Sample ,t/easvrernent" (actual sample type used during monitoring period) and as <br />"Permit Reyuirernenl," (e.g., Enter "Grab" fx indisidual sample, "1J1/C"' for 24-hour composite, "1!rf!" for <br />condnupus monitoring, etc.) <br />10. Where violations of permit requirements are r:ported, attach a brief exp'anation to describe cause and corr_c:ive <br />actions taken, and reference each violation by date. <br />l 1. tf "no dscharge" occurs during monitoring period, curer "A'o Drscharge" across form in place of data entry. <br />l2. Enter ".,Name~Ti!!e ojPrincrpal Executive Officer" with "Signature ojPrincipal Executive Officer ojAuthoriaed <br />Agent,"'"Telephone Number," and "Date" a[ bo0om of form. <br />13. Mail signed Report to Office(s) by date(s) specified in perntit. Retain copy for your records. <br />14. More d tailed instructions for use of [his Discharge A4on!loring Report (D,L1RJ form may be obtained from Office(s) <br />specified in permit. <br />~, Legal Notice <br />This report is roquired by law (33 U.S.C. 1318; 40 C.F.R. 125.27). Failure to report or failure to report truthfully can <br />result in civil ~enalties not to exceed $10,000 per day of violation; or in criminal penalties not to exceed 525,1X10 per day <br />of violation, on by imprisonment for not more than ant: year, or by both. <br />EPA Fotvt 3320-1 (Rev. 08-95) <br />