My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21160
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:47 PM
Creation date
11/20/2007 2:02:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Hydrology
Doc Date
9/14/1999
Doc Name
3RD QUARTER 1999 INSPECTIONS
From
NEW HORIZON MINE
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />WATER, SEDIMENT, OR SLURRY IMPOUNDMENTS <br />Inspectors Name: 1`._~c G,.,,~C~ Date:___ r 1•S' Qq <br />NPDES ID. No.:CO-0000213 009 Date Last Inspected: ~,_~~_q0i <br />Facil ity Configuration:Side Hill Pond <br />Site Name: Impoundment #009 Location:9 7N16W36CB <br />Mine Name: New Horizon Mine Location:2 mi.NW of Nucla. CO. <br /> <br />Mine ID No.: CMLRD Permit #0008-81 <br />Owner s Rep.: R. L. Wade. Mine Manager <br /> CIRCLE OR WRITE IN APPROPRIATE R ESPONSE <br />1. Foundation Preparation (removal of vegetation, slumps., tops oil) ~ Po N/A <br />2. Lift thicY.ness (inches) <br />3. Compaction according to approved plan ~ No N/A <br />4. Burning (specify extend and location) Yes ~ IJ/A <br />5. Angle of slope: 3:1 upstream, 3:1 downstream <br />6. Seepage (specify location, color, and approx. volume) <br /> a.) Fiom underdialn pipes: Yes ~ N/A <br /> b.) At isolated points on emban Y.ment Slopes: Yes ® N/A <br /> c) At natural hillside: Yes ~ N/A <br /> d) Over widespread areas Yes ® N/A <br /> e) FLOm downsteam foundation area Yes ~ N/A <br /> f) "Boils" beneath steam or ponded water Yes ® N/A <br />7, Ciac ks or scarps on crest Yes ® N/A <br />8. Cracks or scraps on slope Yes ~ N/A <br />9. Sloughing or bulging on slope Yes ® N/A <br />10. Major erosion problems Yes ~ N/A <br />11. Surface movements in valley bottom or on hillside Yes ~ iJ/A <br />12. Erosion of toe Yes ® N/A <br />13. water impounded against toe Yes ~,® N/A <br />19. Existing embankment freeboard (feet) ~~ L Feet <br />15. Cracks, bulging, or erosion on upsteam face Yes ~ N/A <br />16. Visible sumps or sinkholes in slurry surface Yes ® N/A <br />17. Clogging <br /> a) Spillway channels and pipes Yes ~ N/A <br /> b) Decant system Yes ® N/A <br /> c) Diversion Ditches Yes ® N/A <br />1B. Cracking or crushing of pipes <br /> a) Spillway pipes Yes ® N/A <br /> b) Decant System Yes ~ N/A <br />19. Trash racks clear and in place ~ No N/A <br />Toc~ O ~ 4)e~+r i ~ ~i~or . <br />c: \data\wpdata\damform.doc <br />9~ 9- 9~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.