Laserfiche WebLink
~ ~ III IIIIIIIIIIIII III <br />impoundment criteria of Rule 4.05.9(3), the State Engineer's Office or C.R.S. 37-87- <br />105. <br />The attached inspection sheet covers other items related to the ongoing performance of <br />the pond at the time of the inspection. <br />I certify that the sediment pond at the Rimrock Mine has been constructed according to <br />the plans and is functioning well and that prudent state-of-the-art engineering has been <br />employed and the dam is sound, with no current environmental threats or construction <br />& maintenance problems. <br />~~••••~:"`~' I certify that this drawing was prepared by me <br />t'~ C. ~F~tj9`~o or under my supervision and that the <br />~: information contained herein is accurate to <br />20335 :~ the best of my kn wledge and belief. <br />~~~ Date <br />S/AUw~ <br />