Laserfiche WebLink
y BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORId ~ <br />POnd GOLDEN EAGLE NPDES NO. 003 <br />Date of Inspection (~fCSi^,(ffa ~2 .795 • <br />EMBANKMENT .. <br />1. Adequacy of the vegetative cover: xcellen Moderate, Few, poor <br />2. Erosion loaning gullies: Extensive, Some, Very Few, on <br />3. Is wave action causiaq erosion: <br />On the upstreaa embankment? Yes No X <br />• At the principal spillway inlet? Yes No~_ <br />4. Erosion of the downstream toe of the embankment,? Yea No~_ <br />The cause of the erosion !a attributed to: <br />5. Ia seepage occurring through the dam? Yee No ~( If yea <br />could this seepage cause potential instnbility~ Yes No~_ <br />Explain: <br />PRINCIPAL SPILLMAY <br />i. Ys the principal spillway system in working order? Yes~Mo <br />2. Is the inlet free of debris and restrictive saterial?Yes~No <br />C, <br />3. Ia the discharge outlet free of restrictive mate.rial7 Yes_~NO_ <br />4. is erosion occurring at the discharge outlet? Yes No~~If <br />Yes, <br />avnluate the severity: Extensive. Moderate Just starting on <br />~''t~ <br />EMERGENCY SPILLMAY <br />1. is the overall emergency spillway system capable of passing <br />design storm discharge? Yes~_No <br />•; 2. Does it appear as if the emergency'spillway has discharged water <br />since the last inspection? Yea No~_ <br />3. Ia erosion occurring at any section o! the emergency ^pillway7 <br />. Yea No~_ Describe the <br />.extent <br />BEDIMENT STORAGE CAPACITY <br />1. .Has the design storage capacity of the reservoir bean surpassed? <br />Yea No~_ If yea, <br />~~ explain: ~ <br />~• ~~"~~' Please add an s ecial cosnents concernin otential7. den Brous <br />~4 problems on the back of this sheet. g p Y g <br />Inspector_~~ <br />