Laserfiche WebLink
• BASIN RESOURCES, INC. <br />( SEDIMENTATION POND INSPECTION FORM ~ <br />' POnd GOL EN EAGLE SAE 11 S 11A NPDES NO. CONTAINMENT DITCH <br />l Date of Inepaction /~~7, / 7 /SSA <br />EMBANKMENT <br />1. Adequacy o! the vegetative cover: xcellent Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, eoae, Very Few, None <br />3. Is wave action causing erosion: ,Coss .~~T ~P~~ <br />On the upstream embankment? 1~ea No <br />At the principal spillway inlet? Yss No <br />4. Erosion of the downstream toe of the embankment? Yee No <br />The cause of the erosion is nttributed to: <br />f~oFf NoT /~1l <br />5. Ia seepage occut=lnq throng the dam? Yes No If yea <br />could this seepage cnuae potentinl instability? Yes No <br />Explain: <br />PRINCIPAL SPILLNIIY ~y~~~ <br />1. is the principal spillway system in working order't Yes No <br />,~~-r <br />2. Is the inlet free of debri^ and restrictive mater:lal?Yea No <br />No n/r" <br />3. Is the discharge outlet free of restrictive mater:Lal? Yes No_ <br />./O~L " <br />4. Is erosion occurring at the discharge outlet? Yen No If <br />yea, <br />evaluate Lhe severity: Extensive. Moderate Jue:t starting None <br />EMERGENCY SPILLMAY <br />1. Is the overall <br />design storm d <br />2. Does it appear <br />since the last <br />No ^'~ ' <br />emergency spillway system capable of passing <br />Lacharge? Yes No <br />No~/C <br />as if the emergency'spillway has cliacharged water <br />inspection? Yee No <br />,/v.-~ <br />3. is erosion occurring et any section of the emergency spillway? <br />Yes No Describe the " <br />extent <br />" SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir bean surpassedT <br />Yea No~_ i! yes, <br />explain: ~ <br />~'~:;;,' Pleaap add any special coa~ents concerning potentiallp~ dangerous <br />problems on the beck o! this sheet. <br />Inspector-1p~"`~` <br />