Laserfiche WebLink
KERR COAL COMPANY <br />KERR MINE <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Pond C <br />vate 3-23-2u05 <br />1. Water Level (above or below dewatering orifice) Above_ Below X <br />2. Sediment Level [below dewatering orifice (designed sediment level)] <br />3. Sediment Removal Required Yes <br />4. 6utflow (depth of flow in weir} <br />S. Outflow <br />4.0 Ft <br />4.5 Ft <br />No - <br />0 Ft <br />0 CFS <br /> PROBLEM <br />FBATtlRE$ <br />Y&8 <br />NO CODII?ENTS <br />EROSION: <br />Rills ~ Gullies on Embankments <br />X <br />Wave Erosion X <br />Spillway Erosion X <br />Burrows X <br />Others X <br /> <br />STRUCTURAL: <br />Differential Settling <br />X <br />Cracks or Slides X <br />Seepage X <br />Other X <br /> <br />STRUCTURES: - <br />Principal Spillway <br />Clogged Orifice <br /> <br />X <br />Clogged or Damaged Culvert Y, <br />Weir X <br />Emergency Spillway <br />Erosion <br />X <br />Rip rap X <br /> <br />MAINTENANCE REQUIRED: None. <br />MAINTENANCE PERFORMED: None. - <br />RDDITIOASAL COMMENTS: None. <br />WAME OF INSPECTOR L <br />