My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21119
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:46 PM
Creation date
11/20/2007 2:01:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Hydrology
Doc Date
4/7/2004
Doc Name
2004 Annual Impoundment Inspection
From
J.E. Stover & Associates
To
DMG
Permit Index Doc Type
Prof Pond Certifications
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C.B. MINERALS COMPANY, LLC <br />COAL RIDGE NO. 1 MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundment located at the Coal Ridge No. 1 Mine. <br />On March 30, 2004 I performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the pond has a <br />-potential for-failure. There was no appearance of-erosion, instabiliry,-structural - <br />weakness or other hazardous conditions. There are no required monitoring procedures <br />or instrumentation other than quarterly and yearly inspections. There are no aspects <br />which might affect stability and there is no required maintenance. The east and west <br />cells of the pond were dry. <br />The sediment pond has the following capacity: <br />Note: <br />IMPOUNDMENT CAPACITIES -ACRE FEET <br /> Water Sediment Total <br />Sediment Pond 6.34 0.90 7.24 <br />Capacities are derived from Figure 4.3-6, Issue No. 1 dated 7/27/00 and <br />verification of sediment level relative to primary spillway. <br />To the best of my knowledge and belief, the impoundment has been maintained as <br />designed and in accordance w~dk~e~Proved plan and applicable regulations. <br />'+~oga~ ~ , o ~,~ S1~~9~ <br />+ V~ ~ N~~ ~' ~~p~ <br />~ : ~ :-; <br />w <br />.o,James E. Stovi~t' Date <br />o. 19230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.