Laserfiche WebLink
Cotorado Department of Public Health and Environment <br />Air Pollution Control Division <br />-MINING OPERATIONS - <br />1 <br />2 <br />3 <br />4 <br />K. FINISHED PRODUCT STOCKPILES <br />Page 5 of 6 <br /> Maximum Stored At One Time: 40,000 Tons <br /> Proposed Controls For Finished Product Stockpile: <br /> ® Watering as needed Times/Day <br /> ^ Chemical Stabilizer <br /> ^ Compacting Of Piles <br /> ^ Enclosures Type: (Complete or Partial) <br /> ^ Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br /> ^ Other (specify) <br />L. RAW MATERIAL TRANSPORT FROM REMOVAL SITE TO STOCKPILE(S) <br /> Haul road distance (one way) 300 Feet <br /> Road surface silt content (if known) <br /> Posted speed limit on haul road m.p.h. <br /> ^ Watering <br /> ^ Frequent (Watering Frequency of 2 or More Times Per Day) <br /> ® As Needed <br /> ^ Chemical Stabilizer <br /> ^ Gravelling <br /> Other: <br /> Vehicle Tvoe C aci Emnty Weieht No. OfTrios PerlDav <br />1 18-Wheelers Tons Tons <br />2 10-Wheelers Tons Tons <br />3 4-Wheelers 6 Tons 26 Tons 20 will feed screen plant <br /> directly <br />4 Haul Truck 25 Tons 20 Tons 10 <br />M. FINISHED PRODUCT TRANSPORT (ON SITE) <br />Amount of material for off-site transfer: 40,000 Tons per year <br />On-site haul road distance (one way) 300 Feet <br />Road surface silt content (if known) <br />Posted speed limit on-site: m.p.h. <br />® Watering <br />^ Frequent (Watering Frequency of 2 or More Times Per Day) <br />® As Needed <br />^ Chemical Stabilizer <br />^ Gravelling <br />^ Paving <br />Other: <br />Vehicle Tvoe <br />18-Wheelers <br />10-Wheelers <br />4-Wheelers <br />Ca aci Ein tv Weieht <br />23 Tons 19 Tons <br />Tons Tons <br />Tons Tons <br />Tons Tons <br />No. Of Tn~s Per/Day <br />20 <br />Revised September 2004 htm://www.cdohestate.co.us/ao/stationarv.aso <br />