Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond NEW ELK NPDES Ho. 006 <br />Date of Inspection <br />EMBANKMENT - <br />- -- 1. Adequacy of the vegetative cover: Excellent Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, Very Fow, 1(on ~~ <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yea No_~ <br />At the principal spillway inlet? Yee No~_ <br />4. Erosion of the downstream toe of the embankment? Yea No_ ~ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yea No_~_ If es <br />could this aeepege cause potential instability? Yea No,~ <br />Explain• <br />P1tINCIPAL SPILLNAY ~/p,/~ <br />1. Ia the principal epil-Tway system in working order? Yee Ho <br />F 2. Is the inlet free of dwe~bris and restrictive material7Yea_~No <br />t\--- 3. is the discharge outl8t~,f~r/ee of restrictive material? Yee No_ <br />4. Is erosion occurring at the discharge outlet? Yes No If <br />yes, <br />,, evaluate the severity: Extensive. Moderate Juat stetting Hone <br />'C ' <br />EMERGENCY SPILLNAY ~~~..C ' <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yea No <br />2. Does it appear as if the emergency'spillway has discharged water <br />since the last inspection? Yea No~_ <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yea No K Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Hae the design storage capacity of the reservoir been surpassed? <br />Yea No_~ If yea, <br />explain• ~ <br />;, Please add any apeciel comments concerning potentially dengeroua <br />problems on the bock of thin sheet. <br />Inspector <br />