Laserfiche WebLink
SEDCAD 4 for Windows <br />r~,,,.d,.m ~ooa c„~ai~ i c~n,..~n <br />Dewater Time: 2.04 days <br />• Dewatering time is calculated from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br />• <br />• <br /> <br />Elevation Area <br /> <br />(ac) Capacity <br /> <br />(ac-ft) Discharge <br /> <br />(cfs) Dewater <br />Time <br />(hrs) <br />7,oos. oo o.ooz o.ooo o.ooo <br />7,oos. so 0.007 o.ooz o.ooo <br />7,006. 00 O.Ols 0.007 0.000 <br />7,006. 50 0.026 0.018 0.000 <br />7,007. 00 0.041 0.034 0.000 <br />7,007. 50 0.058 0.059 0.000 <br />7,008. 00 0.079 0.093 0.000 <br />7,008. 50 0.107 0.140 0.000 <br />7,009. 00 0.139 0.201 0.000 - <br />7,009. 50 0.300 0.308 0.000 <br />7,010. 00 0.522 0.511 0.000 <br />7,010. 50 0.638 0.801 0.000 <br />7,011. 00 0.766 1.151 0.000 <br />7,011. 50 0.935 1.576 0.000 <br />7,012. 00 1.120 2.089 0.000 <br />7,012. 50 1.336 2.702 0.000 <br />7,013. 00 1.570 3.427 0.000 <br />7,013. 50 1.663 4.235 0.000 <br />7,014. 00 1.758 5.090 0.000 <br />7,014. 50 1.851 5.993 0.000 <br />7,014. 80 1.906 6.656 0.000 <br />7,O1s. 00 1.946 6.942 0.000 <br />7,015. 30 2.004 7.s34 0.000 Spillway #2 <br />7,015. 50 2.042 7.939 0.352 13.93* <br />7,015. 80 2.101 8.560 0.530 19.18* <br />7,016. 00 2.140 8.984 0.675 8.55 <br />7,016. 38 2.216 9.819 1.010 12.20 Peak Stage <br />7,016. 50 2.239 10.079 1.114 <br />7,016. 60 2.2s9 10.304 1.159 <br />7,016. 80 2.300 10.759 1.249 Spillway #1 <br />7,017. 00 2.340 11.224 8.517 <br />7,017. 50 2.444 12.420 26.672 <br />7,018. 00 2.550 13.668 71.086 <br />7,018. 50 2.657 14.970 132.767 <br />7,019. 00 2.766 16.325 212.655 <br />7,019. s0 2.949 17.754 309.336 <br />Filename: Pond 008_25yr_lower pipe.sc4 Printed 07-13-2005 <br />