Laserfiche WebLink
;~ <br />BASIN RESOURCES INI. <br />SEDIMENTATION POND INSPECTION FORM <br />GOLDEN EAGLE MINE <br />DATE OF Inspection~,~ ~J`',~ <br />EMBANKMENT <br />1. Adequacy of vegetative cover: XCELLENT MODERATE, FEW, POOR. <br />2. Erosion forming gullies: EXTENSIVE, SOME, VERY FEW,~ONE. <br />3. Is wave action causing erosion: <br />On the upstream embankment ? YES NO~ <br />At the principal spillway inlet YES__NO~ <br />4. Erosion of the down stream toe of the embankment? YESNO X <br />The cause of the erosion is attributed to <br />5. Is seepage occurring the dam ? YES NO X If yes could this <br />seepage cause potential instability ? YES_N0~ <br />Explain: <br />PRINCIPAL SPILLWAY <br />1. Is the principal spillway system in working order ? YE;S~NO_ <br />2. Is the inlet free of debris and restrictive material? Y'ES X NO <br />3. Is the discharge outlet free of restrictive material? Y'ES~NO_ <br />4. Is erosion occurring at the discharge outlet? YESNO ~if s <br />Evaluate the severity: EXTENSIVE MODERATE JUST STARTING ONE <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? YES~NO_ <br />2. Does it appear as if the emergency spillway has discriarged fiats <br />water since the last inspection? YES_NO X <br />3. Is erosion occurring at any section of the emergency spillway? <br />YES_NO~ Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been <_;urpassed? <br />YES NO X If yes, Explain: <br />Please add any special comments concerning potentially dangerous <br />problems on the back of this sheet. <br />NPDES No. R::VER PONDS <br />INSPECTORy~~GC~~~ <br />