Laserfiche WebLink
<br />BASIN RESOURCES INI. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond GOLDEN EAGLE MINE <br />DATE OF Inspection~~`j, ~J`'/~,~ <br />NPDES No .GE-003 <br />EMBANKMENT <br />1. Adequacy of vegetative cover: EXCELLENT MODERATE, FEW, POOR. <br />2. Erosion forming gullies: EXTENSIVE, SOME, VERY FEW,CDNE <br />3. Is wave action causing erosion: <br />On the upstream embankment ? YES NO~ <br />At the principal spillway inlet YES__NO~ <br />4. Erosion of the down stream toe of the embankment? YESNO a' <br />The cause of the erosion is attributed to <br />5. Is seepage occurring the dam ? YES <br />seepage cause potential instability ? <br />Explain: <br />N0~ If yes could this <br />YESNO~_ <br />PRINCIPAL SPILLWAY <br />1. Is the principal spillway system in working order ? YES~NO_ <br />2. Is the inlet free of debris and restrictive material? YES~NO_ <br />3. Is the discharge outlet free of restrictive material? YES X NO <br />4. Is erosion occurring at the discharge outlet? YES NO~~( if es <br />Evaluate the severity: EXTENSIVE MODERATE JUST STARTING ONE <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? YES a/ NO_ <br />2. Does it appear as if the emergency spillwa has discharged has <br />water since the last inspection? YESN0~ <br />3. Is erosion occurring at any section of the emergency spillway? <br />YES_NO~ Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />YES_NO~If yes, Explain: <br />Please add any special comments concerning potentially dangerous <br />problems on the back of this sheet. <br />INSPECTOR_E~~E~~' y/-c <br />