Permit No
M2002004
IBM Index Class Name
Permit File
Doc Date
5/28/2002
Doc Name
Bond Calculation
From
DMG-ALA
To
DMG-AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />u <br />`J <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 05/08/2002 <br />User: ALA <br />State :Colorado <br />County :Pueblo <br />Site :Red Rock <br />PermiUjob# : M-2002-004 <br />Abbreviation :none <br />Filename : M004-002 <br />Agency or organization name : DMG <br />Permit or other job action :Bond Calculation <br />Task description : Grading Slop <br />HOURLY EQUIPMENT COST <br />to 4:1 <br />Basic machine :Cat D9R - 9U <br />Blade type :Universal <br />Attachment no. 1 :BOPS Cab <br />Attachment no. 2 :1-shank rippe <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosuhour : $55.12 NA <br />Operating cosuhour : $96.43 100 <br />Ripper op. cosuhour : $2.37 20 <br />Operator cosuhour : $27.99 NA <br />Total unit cosuhour : $181.91 Total fleet cosuhour : $383.82 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 257, 900 BCY factor : 1.430 volume : 388, 797 LCY <br /> <br />Source of estimated volume :Permit Application <br />Souroe of estimated swell factor :Estimate <br />HOURLY PRODUCTION Job Condition Conection Factors Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 952.6 LCY/hr <br />Material consistency description <br />Rock, wel! upped or blasted <br />Average push gradient : 10.00 % (~ <br />Average site altitude : 5,000 feet <br />Material weight : 3,300 Ibs/LCY <br />Weight description <br />Decomposed rock - 75% Rock, 25% Earth <br />• JOB TIME AND COST <br />Fleet size : 2 Dozers) <br />Operator skill : 0.75 (avl <br />Material consistency : 0.80 (Cat. <br />Dozing method : 1.00 (get <br />Visibility : 1.00 (avl <br />Job efficiency : 0.83 (fshift <br />Spoil pile : 0.80 (fnd <br />Push gradient : 1.22 (Ca[ <br />Altitude : 1.00 (Cat <br />Material weight : 0.70 (Cat <br />Blade type : 1.00 (S/Sl <br />Net correction : 0.34 <br /> <br />Adjusted unit production : 324.03 LCY/hr <br />Adjusted fleet production : 648.05 LCY/hr <br /> <br />Total job time : 569.09 Hours <br />HB) <br />HB) <br />Unit cost : $0.561 /LCY Total job cost : $207,044 <br />