My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE49368
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE49368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:51:16 PM
Creation date
11/20/2007 2:00:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Permit File
Doc Date
5/28/2002
Doc Name
Bond Calculation
From
DMG-ALA
To
DMG-AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIT COST CALCULATION TABLE :Building Demolition and ON-site Disposal in Approved Landfill <br />• <br />Las[ cost update :January, 2001 <br />Data source :MEANS Site Work and Landscape Cost Data, Sec. 02220 (crews B3 8 881ess trucks) <br />Cost Reference Guide and Contractors Equipment Cost Guide (oH--site Dsposal costs). <br />NOTES :CF = tunic Fopr volume of siandmg soucWre. iolai cost should include tlemoiition PLUS disposal pLUS any Gump cnarges. <br />Cosls snows tlo NOT inlube costs br removal of concraie floor slabs or sub-grabe loundationslloolers. <br />CV rubble per CF est. at 25 % pl standing structure vol., e.g. t0' x ID' x 10' bldg. = 1.000 CF12] = 3) Oa CY x .25 = 9.26 CV rubble. <br />Hauling <osls -Cal 9I3 track loader per iRUCKt slleel, 812-1B CV on-nvry truck (30 mph io 5 mi., 50 mph 15 +mi.) per TRUCK2 sneer. <br />Refer to item no. 1 of the Unit Cost Calculation Table for Building Demolition and On-site Disposal. <br />NOTE:ORGICECG costs must De adi. by inverse of MEANS loca0on atlj. to prevent appl. of atl6 1o nOn-MEANS tlata sources on vrorksheei printout. <br />Converslon:CRG/CECG costs -Location adj. = 89.2% Inverse = 112.11 % of base cost <br />• <br />5 mile haul :Demolition - (MEANS crews 63 & 88-less tmcking) non-conaete = $0.107 $0.129 per CF <br />Demolition - (MEANS crews B3 & 68-less trucking) concrete = $0.140 $0.174 per CF <br />i Disposal-Haul rubble to dump, CRG= $2.122 w4oc. adj. - $2.379 $2.379 per CY <br />Conversion - CY/CF x % shrinkage = 0.037037 25%p 0.00926 0.00926 CF per CY <br />Adjusted hauling cost (convert $/CY rubble to $/CF bl dg. vol,) _ $0.022 $0.022 per CF <br />Dump fees -Bldg. constr. mat. CosUCY - $45.83 $0.424 $0.424 per CF <br />TOTAL COST = non-concrete = E0.5E3 E0.576 per CF <br /> concrete - E0.566 E0.620 per CF <br />15 mile haul: Demolition - (MEANS crews B3 & 88-less trucking) non-concrete = $0.107 $0.129 per CF <br />Demolition - (MEANS crews B3 8 88-less trucking) concrete = $0.140 $0.174 per CF <br />Disposal-Haul rubble to dump, CRG= $3.631 w/loc. adj. - $4.071 $4.071 per CY <br />Conversion - CY/CF x %shdnkage = 0.037037 25% 0.00926 0.00926 CF per GY <br />Adjusted hauling cost (convert $/CY rabble to $/CF bl dg. vol.) _ $0.038 $0.038 per CF <br />Dump fees -Bldg. constr. mat. CosUCY $45.83 $0.424 $0.424 per CF <br />TOTAL COST = non-concrete - 50.569 E0.591 per CF -~- <br /> concrete = E0.602 E0.636 per CF <br />30 mi/e haul: Demolition - (MEANS crews B3 & 68-less trucking) non-concrete = ~ $0.107 ~ $0.129 per CF <br />Demolition - (MEANS crews 63 & 88-less trucking) concrete = $0.140 $0.174 per CF <br />Disposal-Haul rubble to dump, CRG= $7.026 wnoc. adj. - $7.877 $7.877 per CY <br />Conversion - CYlCF x % shrinkage = 0.037037 25% 0.00926 0.00926 CF per CY <br />Adjusted hauling cost (convert $/CY rubble to $/CF bl dg. vol.) _ $0.073 $0.073 per CF <br />Dump fees -Bldg. constr. mat. CosUCY - $45.83 $0.424 $0.424 per CF <br />TOTAL COST = non-concrete = E0.604 E0.626 per CF <br /> concrete E0.637 E0.671 per CF <br />60mtle haul: Demolition - (MEANS crews B3 8 B8-lesstrucking) non-concrete = $0.107 $0.129 per CF <br />Demolition - (MEANS crews B3 & B8-less trucking) concrete - $0.140 $0.174 per CF <br />Disposal-Haul rubble to dump, CRG= $13.817 w/loc. adj. - $15.490 $15.490 per CY <br />Conversion • CY/CF x %shdnkage = 0.037037 25% 0.00926 0.00926 CF per CY <br />Adjusted hauling cost (convert $/CY rubhle to $/CF bldg. vol.) _ $0.143 $0.143 per CF <br />Dump fees -Bldg. constr. mat. CosUCY $45.83 $0.424 $0.424 per CF <br />TOTAL COST = non-concrete = E0.674 E0.697 per CF <br /> concrete = E0.707 E0.741 per CF <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.