Laserfiche WebLink
• <br />r~ <br />L <br />Office Floor Concrete 11545 cf $ 3.07 $ 35,444.87 <br /> <br />Subtotal Dertrolilion of Plant Site $ 7,160,626.05 <br />Concrete Disposal 178755 cf $ 0.33 $ 58,989.15 <br />Superswcture Disposal z.25 2809021.75 Cf $ 0.37 $ 1,039,338.05 <br />Demolition of Asphalt 93852 sf $ 0.51 $ 47,864.52 <br /> <br />Subtotal Demolition and Disposal of Plant S 8,306,617.77 <br /> <br /> <br />Railmad Spur Track 20000 ft $ 6.52 $ 130,400.00 <br /> Ballast 20000 Cy $ 2.74 $ 54,800.00 <br />Subtotal Railroad $ 185,200.00 <br /> <br />Red ROCk Ouany Crusherana COnveyois Crusher 19200 4 $ 0.59 $ 11,347.20 <br />Foundation Concrete 4800 cf $ 3.07 $ 14,736.72 <br /> Conveyor 48000 Cf $ 0.59 $ 28,368.00 <br /> Conveyor 32400 cf $ 0.59 $ 19,148.40 <br /> Conveyor 14400 Cf $ 0.59 $ 8,510.40 <br /> Conveyor 14400 cf $ 0.59 $ 8,510.40 <br />Fauntlatnn Concrete 4550 cf $ 3.07 $ 13,969.18 <br />Subtotal Quarry $ 104,590.30 <br /> <br /> S 8 596,608.06 <br /> <br />