Laserfiche WebLink
G ..~-• <br />~. <br />II <br />i <br />Mr. Michael S~enton <br />Silverton Facility Bonding Information <br />Page 2 <br />which reclamation surety arrangements for Silverton facilities <br />have been made. Consequently, they are aware of the reolammation <br />requirements at the site and the consequence of default by <br />Standard Metals Corporation. The address of the Bank's Denver <br />office is: <br />Canadian Imperial Bank <br />One Denver Plaza , <br />Suite 925 <br />Denver, Colorado 80202 <br />I believe the preceding information completes your request. However, <br />if you require additional information fox permit issuance, please <br />contact me. <br />Very truly yours, <br />STANDARD METALS CO$PORATIOLQ <br />~~~~~ <br />William Dotterrer <br />Environmental Engineer <br />i <br />-' ~. <br />WD1bb , <br />~,r <br />