Laserfiche WebLink
BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORK <br />Pond NEW ELK NPDES gyp, CONTAINMENT (i2 <br />r Date of Inspection ~~„~ S'. iSfS" <br />EMBANR!lENT <br />1. Adequacy o! the vegetative cover: xcellent Moderate, Pew, Poor <br />2. Erosion forming gullies: Extensive, Some, <br />3. Is wave action causing erosion: <br />On the upstream embankment? <br />At the principal spillway inletT <br />Very Few, ones <br />Yee No~_ <br />Yes No,~_ <br />4. Erosion of the downstream toe of the embankment? Yea No,~_ <br />The cause of the erosion is attributed to: <br />5. <br />Is seepage occurring through the dam? Yea <br />could this seepage cease potential instability? <br />Explain: <br />PRINCIPAL SPILLMAY <br />1. Ie the principal spillway system in working order? Yea~(_No <br />2. Is the inlet free of debris and restrictive material7Yes~(_No <br />3. is the discharge outlet Tree of restrictive material? Yes~~No_ <br />4. Is erosion occurring at the discharge outlet? Yes No_~If <br />yes, <br />evaluate the severity: Extensive Noderete Just starting on <br />~C' <br />EMERGENCY SPILLMAY ' <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yea1o _No <br />2. Does it appear as if the emergency'apillwey has discharged water <br />since the last inspection? Yea No~_ <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yes Nom Describe the <br />extent <br />C <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />Yes No ~C If yes, <br />l Please add any special comments concerning potentially dangerous <br />problems on the beck of thi• ^heet. <br />No~_ If yea <br />Yea No~_ <br />Inspector ~,~.~~,~i <br />