Laserfiche WebLink
)g <br />5 <br />0 <br />E <br />yLr <br />7500 <br />7400 <br />H <br />7300 <br />z <br />0 <br />> 7200 <br />w <br />J <br />W <br />7100 <br />7000 <br />Permit Number C / 5,7,9 00 <br />Class:Wermit <br />Section/Exhibd: col 6.7.7_ E__,ch,b: - -- <br />Class:O Revision ! <br />TeQ` ----- -- -- ---------- -------- --- -- -- -' <br />Class: 0 Repoli liytlro OGenera� <br />Doc <br />OApplicetion (Coal only) O Bond 0 Enforcement O Inspection <br />RIPRAP THICKNESS --------- <br />TYPICAL RIPRAP LINED CHANNEL <br />NOT TO SCALE <br />DISTANCE (FT) <br />Sill PM -8 CHANNEL PROFILE <br />NOTES: <br />1.1 CHANNEL WAS DESIGNED TO SAFELY CONVEY RUNOFF RESULTING FROM THE <br />10 YEAR, 24 HOUR STORM EVENT. <br />2.) DESIGN FLOW ROUNDED TO NEAREST WHOLE CFS FROM SEDCAD HYDROLOGIC ANALYSIS. <br />3.1 DEPTH OF FLOW BASED ON MINIMUM GRADE. <br />4.) VELOCITY BASED ON MAXIMUM GRADE. <br />5.1 S2 PM -8 LOWER IS FROM THE INTERSECTION OF S2 PM -13 TO POND 008. <br />6.1 GEOTEXTILE REQUIRED FOR 050 9" OR GREATER. <br />W <br />z <br />0 <br />> <br />w <br />J <br />W <br />RECEIVED <br />AUG 5 1998 <br />DIV. OF MINERALS <br />& GEOLOGY <br />SCALE <br />100• 0 100• 1100' <br />MORMONTAL A: VDITIC11L <br />I <br />Design Flow <br />Slc a <br />Bottom Width <br />Side Slope <br />Depth of <br />Velocity <br />Freeboard <br />Total Depth <br />Rlprep D50 <br />Channel <br />D, Iclsl <br />I%) <br />IBWI <br />IH:1V) <br />Flow IDI Iftl <br />lips) <br />Intl <br />fit) <br />tin) <br />111 and 121 <br />IfN <br />(3) <br />141 <br />PM -6 <br />15 <br />2 -10.6 <br />1 <br />3 <br />16 <br />6.91 <br />0.3 <br />2.1 <br />9 <br />25 <br />10.7-17 <br />1 <br />3 <br />14 <br />9.36 <br />0.3 <br />V <br />12 <br />PM -6 <br />96 <br />2 -9 <br />10 <br />3 <br />08 <br />ff.1 <br />0.3 <br />11 <br />9 <br />(Lower) <br />96 <br />to -15 <br />10 <br />3 <br />OJ <br />13.52 <br />03 <br />1.0 <br />12 <br />151 <br />NOTES: <br />1.1 CHANNEL WAS DESIGNED TO SAFELY CONVEY RUNOFF RESULTING FROM THE <br />10 YEAR, 24 HOUR STORM EVENT. <br />2.) DESIGN FLOW ROUNDED TO NEAREST WHOLE CFS FROM SEDCAD HYDROLOGIC ANALYSIS. <br />3.1 DEPTH OF FLOW BASED ON MINIMUM GRADE. <br />4.) VELOCITY BASED ON MAXIMUM GRADE. <br />5.1 S2 PM -8 LOWER IS FROM THE INTERSECTION OF S2 PM -13 TO POND 008. <br />6.1 GEOTEXTILE REQUIRED FOR 050 9" OR GREATER. <br />W <br />z <br />0 <br />> <br />w <br />J <br />W <br />RECEIVED <br />AUG 5 1998 <br />DIV. OF MINERALS <br />& GEOLOGY <br />SCALE <br />100• 0 100• 1100' <br />MORMONTAL A: VDITIC11L <br />I <br />