Laserfiche WebLink
<br /> <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.6(17) <br />Mine: Southfield <br />NPDES ID. No.: Coal Loadout Sediment Pond #1 ('Ldeyt~ <br />Inspection Period: First Quarter, 2004 <br />Inspection Date: March 10, 2004 <br />General Description or Reference to Site Plan: <br />This pond is located at the east end of the remote coal loadout facility. The facility is inactive. <br />EMBANKMENT <br />1). Adequacy ofthe vegetative cover: Excellent odera Few Poor <br />2). Erosion forming Gullies: Extensive Some ~ None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes <br />At the principal spillway inlet? Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />Yes <br />No ~ <br />No f/' <br />No ~/ <br />N o // <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of 'restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Yes L~ No <br />Yes J No <br />Yes r/' No <br />Yes No ;/ <br />Just starting None <br />Page 1 of 2 <br />