My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE49223
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE49223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:51:09 PM
Creation date
11/20/2007 1:56:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006016
IBM Index Class Name
Permit File
Doc Date
2/8/2006
Doc Name
Construction Materials Regular Ops Reclamation Permit
From
McStone Agrregate LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:1 process stockpile yard of 2 to 3 acres shall be utilized, at lust, adjacent to the west edge of the prrviuu.c <br />uxurrt~, and then gradually moved into the worked-out 1•irsr Slx,r of the F:asl-Side area of the new quam• as <br />xtracncxr <br />QUARRY CROSS-SECTION (typ) ~•~~ '~ ~•~E <br />.a,wo,....r6 <br />sourr~west _~ ,~% <br />~~~'~~ /, <br />S 4'%~ natural elope 251 <br />_~-' r <br />to 1 ~VertaU <br />_ ~ ~ ~ Oack ~weY sbp <br />__ ~~~I'' Dakota sandstone- r'~' <br />2~r. <br />_ _ - - ~ T Shot M2 ~ Shot #3 Shot N4, etc t <br />dd gwny / _ _,.wo re raoa t _ _ _ _ _ _ _ . <br />- -- <br />--. <br />- - - <br />_- sandstone - _ -,- _ -.-.-'- _--~- - <br />----------- mudsFone ---------------- <br />A 25-foot set-back natural berm from the Plateau Creek gorge welt will be left in-place at the cast edge of <br />the extraction areas. Aflcr reaching the south boundary east of the SW-Nf tributary channel- mining shall <br />proceed west and north in a similar manner <br />l.f <br />It is estimated that the hint .Shot cast of the SW-NE tributary channel will be extracted. processed, an <br />removed within the first two years of operation (Yr-2006--'07), depending upon the market demand for <br />road and other construction uravel, and rip rap That accounts for a surface area about 0 R3 acres of the <br />lure! .tirele 12 R-acre extraction area. 'fhe remaining 6 to 8 shots of the East Side are expected to take from <br />twelve to sixteen more Years to completely mina After that, if the ti'eltow5tone National Park Super- <br />Volcano has not initiated another Glacial Period by that time, the West-Side extractions will commence. <br />through and west of the SW-NE tributary channel <br />Begin Yr-'06 <br />' <br />1 East-Side (E. of old quarry & SW-NE drainage in 25'D x '/i-acre <br />07 <br />Yr- SHOT # <br />Yr-'OS I shots) <br />Yr-'09 <br />Yr-'10 <br /># 2 East-Side (S of old quarry & SW-NE drainage in 25'D x ~/~-acre <br /> <br />Yr-'11 shots) <br />Yr--' 12 <br />' I <br /># 3 East-Side (S of old quarry & SW-NE drainage in 25'D x ~J-acre <br />Yr- <br />13 <br />Yr=14 to '38 ~ shots) <br />- to southeast comer and S b'd'y <br /> Side (SE of SW-NE drainage in 25'D x'/~-acre shots - to W <br />E <br /> # 4 . .- <br />..etc. <br /> b'd'y) <br />- west to southwest corner and west bd'y in 25' x ~/3_acre shots <br />Yr-203941 HOT #12 I West-Side (thru 8 NW of SW-NE drainage channel) <br /> <br />Yr- 2042 to .. #13 West-Side <br />,~ <br />'S3 <br />' <br /># <br />14 - north 8 NE to the W-E drainage channel in 25' x ~/~ -acre <br />45 to <br />Yr- <br /> ' .etc. <br />1--- shots - - <br />- - <br /> -14- <br />nNr,'I1:,Vd 7'ERR7.4T UNfAClTI~'A' <br />Sd4aPn <br />
The URL can be used to link to this page
Your browser does not support the video tag.