Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk /c ~~ ~7iru K vY/ec.u- SE <br />NPDES ID_ No.: None <br />Inspection Period: Second Quarter 2005 <br />Inspection Date: 06/24/05 <br />General Description or Reference to Site Plan: ~C" /L <br />~5 ~ a+'tt~ ~ n cl z e~Q corLZ`a ~ n m ecn~ ba rr•~ ,cS 0. nd~- ~isc~r~~ e j 5~.~' ~c~u.~ <br />oCeSrfae~ c~-~'Fa~ N r~ ~~' ~re-..-,z~ RDat buc~.~ s~ ~/f~ ~4 <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />Excellent Moderate Poor <br />2). Erosion forming Gullies: <br />3). Is wave action pusing erosion: <br />On the Upstream embankment? <br />Yes <br />4). Erosion of the downstream tce of the embankment? Yes <br />Cause of erosion can be attributed to: <br /> <br /> <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />C' _~-- <br />Yes <br />Explain: ~e~Qcv.,evv1`has b~evi Aemicrf~ ~nc-~-~ bnsr`r/ ~C' ~ o~ <br />OTHER OBSERVATIONS: <br />~~.P~~~ <br />SHA Qualfied Impoundment I spector <br />6 -a~~.~ <br />Date <br />Extensiv ome Few None <br />Page 1 of 2 <br />