Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: Pond #8 <br />Inspection Period: Second Quarter 2005 <br />Inspection Date: 06/24/05 <br />General Description or Referenc.pe~ t,o Ske Plan: <br />-J7irs ~o~~„pp~ is loccXkr~' /U°A~ a/~w~ 1~.QZ~ ~L~7 ~'`S'2.n <br />r¢~Sg- c~isfJoSo.e 0.0``eL/ ~ p~-2_. ~~xt /S <~ES<~~reJ~- <br />(~ ~~c.n-~~ ~r^a--•-~ (~- ~e1T~S-~ 5dr5~Jos Pea <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. cellen Moderate Few Poor <br />2). Erosion forming Gullies: Extensive Some ew None <br />3). Is wave action causing erosion: <br /> On the Upstream embankment? Yes No /i- <br /> Atthe principal spillway inlet? Yes No , _ <br />4). Erosion of the downstream tce of the embankment? Yes No ~, <br /> Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No ~ <br /> Could this seepage cause potential instability? <br /> <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? Yes ~ No <br />2). Is the inlet free of debris and restrictive material? Yes ~ No <br />3). Is the discharge outlet free of restrictive material? Yes /~ No <br />4). Is erosion occurring at the discharge outlet? Yes No ~ <br /> Evaluate the severity: Extensive Moderate Just starting None <br />Page 1 of 2 <br />