Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New EIk <br />NPDES ID. No.: Pond #4 <br />Inspection Period: Second Quarter 2005 <br />Inspection Date: 06/24/05 <br />General Description or Reference to Site PI n: <br />~rs SesQtmetn~ C~-*.`~ 'F'~c~,~ /yes rie,~-,~/ (~ l~eUe~oPirec(`~`lr/rs~ <br />o~na( rs cQesrya~ ~ ~u~ea~-~^uyt-~~ i+`~,~r "Z~- t7a/~? <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion fonning Gullies: <br />3). is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spilNvay inlet? <br />Yes <br />Yes <br />4). Erosion of the downstream tce of the embankment? Yes <br />Cause of erosion can be attributed to: <br /> <br />!~ <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability/? <br /> <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />celle Moderate Few Poor <br />Extensive Some Few one <br />Yes r/ No <br />Yes ~ No <br />Yes ~ No <br />Yes No ~ <br />Just starting None <br />Page 1 of 2 <br />