Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk WPs~fu~-y'n,~ Cvn~~rNVrrevt~'~~- <br />NPDES ID. No.: None <br />Inspection Period: Second Quarter 2005 <br />Inspection Date: 06!24!05 <br />General Description or Reference to Site Plan: ~1 s~ ~( 0 ~Q <br />7hrS C~ri~~~l4Yte«~ 6~-.Sf~tl ~$ c~ r/oK~dtSty~~i 5l7"~~"Vf'~ cieS/JN <br />Td Con`EufN f`kN-%~ ^~r>.,n ~ G/~5~1~0/~a-~ RIrS~°~jou~t~~°.yrufdCf Qt~eOS. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. cellen Moderate Few Poor <br />2). Erosion forming Gullies: Extensive Some ~ None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />n . Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />Sin <br />C!/a S GI <br /> <br />lllyr <br />/~~~~ <br />KASHA Qualified Impoundment spector <br />arf -O.~ <br />Page 1 of 2 <br />