My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO20933
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO20933
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:42 PM
Creation date
11/20/2007 1:55:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Hydrology
Doc Date
7/16/1999
Doc Name
FRESHWATER POND FW-1 WEST ELK MINE PN C-80-007
From
MOUNTAIN COAL CO
To
DMG
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN COAL <br />COMPANYL.L.c. <br />A Subsidiary of Arch Western Resources, LLC <br />July 13, 1999 <br />Mr. Jim Burnell <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />III IIIIIIIIIIIIIIII <br />Wes[ Elk Mine <br />P O Box 591 <br />5174 Highway 133 <br />Somerset, CO 81434 <br />(970)929-5015 <br />Fax (970) 929-5595 <br />RECEIVED <br />JUL 161999 <br />Division of Minerals 8 Geobgy <br />RE: Freshwater Pond (FW-1); West Elk Mine; Permit No. C-80-007 <br />Deaz Jim: <br />To accommodate the return flow measuring requirements of Mountain Coal Company, L.L.C.'s <br />(MCC) North Fork Augmentation Plan, a pipe has been installed in the concrete headwall located <br />in the emergency spillway of the freshwater pond (FW-1). As you know FW-1 contains only <br />water pumped from the North Fork of the Gunnison River through the Raw Water Intake <br />Gallery; no stormwater runoff is directed to the pond. <br />An 8-inch victaulic pipe was installed through the concrete headwall located in the emergency <br />spillway. An anti-seep collar was placed azound the pipe to ensure that the pipe will not leak. <br />The pipe was designed to accommodate occasional overflow water from overfilling FW-1 with <br />water from the North Fork. In the event of larger flows, the open channel emergency spillway <br />will continue to function as designed. <br />A transducer cable will then be installed in the pipe and attached to a 950 Sigma Flowmeter, <br />similaz to the flowmeters located at the Lone Pine Pipeline and sediment pond SG-l . The <br />continuous flowmeter will measure return flows to the North Fork, which will assist us in <br />calculating the West Elk Mine's depletion volume for our North Fork Augmentation Plan. <br />Please contact me if the Division requires additional information. <br />istine E. <br />Environmental <br />cc: Henry Barbe <br />Phil Schmidt <br />dmg071399.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.