Laserfiche WebLink
I • The soil pit descriptions and the surface vegetation suggest that the existing <br />AVF boundary should be relocated approximately 200 feet southeast of soil pit <br />I #3 as shown on Exhibit 1. With this modification to the AVF boundary, the <br />100-foot wide access road corridor will potentially affect 1,400 linear feet of <br />AVF. This will result in approximately 3.2 acres of AVF affected by road <br />I construction activities. TMCC's road construction designs include placing <br />geotextile fabric over the AVF soils. This design may be expected to <br />significantly reduce impacts to these soils. <br />• <br />• <br />3 <br />