Laserfiche WebLink
Since 1987, tlow was observed at Bond Creek only three years in August and only one year in <br />• September. At Cow Camp Creek since 1987, flow was observed only one year in August and never in <br />September. Neither Fish Creek site is monitored ii both Cow Camp Creek and Bond Creek are not <br />flowing. <br />Finally, Spoil Spring 10A, located in the Pond 002 basin, will be added to the monitoring program. It <br />will be monitored at the same trequency as other spoil springs Isee Table 7-1031. <br />References <br />Cooper, H.H., Jr., J.D. Bredehoeft, and I.S. Papdopulos. 1967. Response to a finite diameter well to <br />an instantaneous charge of water: Water Resources Research, V.3, No.t, pp. 263-269 <br />Office of Surface Mining Reclamation and Enforcement, 7989. "Draft Environmental Impact <br />Statement", OSMRE-EIS-25. <br />Skibitzke, H.E. 7963. Determination of the coefficient of transmissibility from measurements of <br />residual drawdown in a bailed well: In Methods of determining permeability, transmissibility <br />and drawdown, R. Bentall, compiler, U.S. Geological Survey Water-Supply Paper 1536-I, <br />• pp. 293-298. <br />• <br />7R-36 7-379 Revised 05/OQ <br />